I posted pics in my other thread but thought someone may want to build one so I posted this in a new thread..
All the metal is 1/8" thick I cut 2 main supports for 1x1 square stock at 2 feet I added a base plate 2inch wide by 4" long welded them ( dident want to weld it to the trailer cause I never know what I may want to place there later.
Next I had some angle laying around so though I would throw it in just if i wanted to hang strap's or something off it I cut this at 3 feet long and welded to the top of the main supports
Then I had 4inch wide flat stock that I cut down to 36inchs and drilled 5 holes in it 1/2inch from one side and 4inchs apart the holes were 1 3/4 round then welded the the main support on top of the angle should have 3inchs on the side hang over to do other thing with
This whole thing cost around $12 to build, there was no way I was going to pay $40 to $100 to order one. Now just needs some paint
All the metal is 1/8" thick I cut 2 main supports for 1x1 square stock at 2 feet I added a base plate 2inch wide by 4" long welded them ( dident want to weld it to the trailer cause I never know what I may want to place there later.
Next I had some angle laying around so though I would throw it in just if i wanted to hang strap's or something off it I cut this at 3 feet long and welded to the top of the main supports
Then I had 4inch wide flat stock that I cut down to 36inchs and drilled 5 holes in it 1/2inch from one side and 4inchs apart the holes were 1 3/4 round then welded the the main support on top of the angle should have 3inchs on the side hang over to do other thing with
This whole thing cost around $12 to build, there was no way I was going to pay $40 to $100 to order one. Now just needs some paint