06-14-2010, 05:21 PM
Although I like excavators my heart is really in CUT work.
So to start this is the mess the excavation company left when they built last fall, the driveway was so bad the wife damaged her car twice and it wasn't her fault, the pot holes were so bad when I backed my 18 foot trailer down it shook the heck out of the truck.
Step one was to fix the driveway which I started around noon and finished at 5, 5 tandem loads of 1/2" crusher run. The goal here was to get a driveway you could drive down as we will be here for weeks.
Starting Friday they want all the dead trees cut and chipped, this will be a three week project for three staff.
Next is to clean up this mess, I will use a rock rake on a 3520 to get the junk out, we will load the junk into one of our dump trailers and haul to a ravine at the back of the property using a 3320 or 2520, whatever is available. We will load using a 50D excavator as the buckets are large and the trailer can hold 5 yards.
Next is to put a proper drain down the driveway, I was shocked at the springs coming out of the bank, one is a good 10 gallons per min, probably the most I have ever seen.
Next will be to landscape along the driveway, they want to incorporate some of the large granite, it's 740 feet long.
We will build a fish pond that you can see in one of the images below where the excavation company tried to divert the water.
What a mess eh? The company that did this quoted $8,000 but charged the builder $32,000 and the builder paid and the homeowner was somehow stuck but legal action is in the works.
Anyhow it was a fun relaxing day, when we are finished we will add another three loads of crushed granite to the driveway and use our ride on roller to compact.
So to start this is the mess the excavation company left when they built last fall, the driveway was so bad the wife damaged her car twice and it wasn't her fault, the pot holes were so bad when I backed my 18 foot trailer down it shook the heck out of the truck.
Step one was to fix the driveway which I started around noon and finished at 5, 5 tandem loads of 1/2" crusher run. The goal here was to get a driveway you could drive down as we will be here for weeks.
Starting Friday they want all the dead trees cut and chipped, this will be a three week project for three staff.
Next is to clean up this mess, I will use a rock rake on a 3520 to get the junk out, we will load the junk into one of our dump trailers and haul to a ravine at the back of the property using a 3320 or 2520, whatever is available. We will load using a 50D excavator as the buckets are large and the trailer can hold 5 yards.
Next is to put a proper drain down the driveway, I was shocked at the springs coming out of the bank, one is a good 10 gallons per min, probably the most I have ever seen.
Next will be to landscape along the driveway, they want to incorporate some of the large granite, it's 740 feet long.
We will build a fish pond that you can see in one of the images below where the excavation company tried to divert the water.
What a mess eh? The company that did this quoted $8,000 but charged the builder $32,000 and the builder paid and the homeowner was somehow stuck but legal action is in the works.
Anyhow it was a fun relaxing day, when we are finished we will add another three loads of crushed granite to the driveway and use our ride on roller to compact.